Davis Bacon Compliance Checklist

Accounting for use of federal funds under the American Reinvestment and Recovery Act:

http://www.rurdev.usda.gov/mi/cp/Davis-Bacon%20checklist%20final.pdf

American Recovery and Reinvestment Act Davis-Bacon Compliance Checklist

Project: __________________________________________________________________

American Recovery and Reinvestment Act funds used for a transaction that involves a new

construction or repair contract, exceeding $2,000, must comply with the prevailing wage

requirements of the Davis-Bacon and Related Acts requirements. This checklist has been

created to provide an overview of the requirements established by the Davis-Bacon and Related

Acts requirements as prescribed in RD Instruction 1940-C. This checklist does not substitute for

the detailed provisions in RD Instruction 1940-C or the Department of Labor requirements for

implementing Davis-Bacon and Related Acts requirements.

As noted in this checklist, the Contracting Officer (CO) is responsible for ensuring that Davis-

Bacon and Related Acts requirements are met. The person designated to perform the duties of

the CO varies by program. The Administrative Notice identifies the individual or firm responsible

as CO for these requirements. The RD Official shall insert the date that each requirement is

completed.

Applicable requirements are listed below.

Before awarding a construction or repair contract.

_______

(date)

Informing the Applicant and Reviewing the Contract:

 

When application is made

to the Agency or a guaranteed lender for assistance involving construction, the

 

Agency or approved lender must inform the applicant that wages paid for labor must

 

not be less than the prevailing wages determined by the Secretary of Labor (RD

 

Instruction 1940-C (1940.106(b))). The Agency must review the contract to ensure

 

that it contains the language provided in RD Instruction 1940.105(a) and the DOL

 

website language (see below).

 

_______

 

(date)

 

Wage Determination:

 

Before bidding, the CO shall download the applicable

Department of Labor (DOL) Davis-Bacon Wage Determination for the work from the

 

DOL website at

 

http://www.wdol.gov/dba.aspx#0

Once on the selection page, the CO

chooses the state, county, and Construction Type. Construction Type choices are

 

“All Construction Types”, “Building” (public buildings), “Heavy”, “Highway”, or

 

“Residential”. Click on “Search”. The CO then scrolls to the bottom, and clicks on

 

“Printer Friendly Version”. The CO then clicks on “File”, “Print”, and inserts the

 

wage determinations into the contract documents.

 

_______

 

(date)

 

 

Information for Bidders:

 

Information provided to any and all bidders shall include

the statement “The contractor must comply with the minimum rates for wages for

 

laborers and mechanics as determined by the Secretary of Labor in accordance

 

with the provisions of the Davis-Bacon and Related Acts.” The CO shall verify this

 

and include a copy of the Wage Determination in the bid information.

 

_______

 

(date)

 

Construction Contract Provisions:

 

All construction and repair contracts

exceeding $2000 must include the statement “The contractor must comply with the

 

minimum rates for wages for laborers and mechanics as determined by the

 

Secretary of Labor in accordance with the provisions of the Davis-Bacon and

 

Related Acts.” In addition, labor standards provisions from 29 CFR 5.5(a) must be

 

included in every contract. See

 

http://www.dol.gov/dol/allcfr/ESA/Title_29/Part_5/toc.htm

.

(The DOL website includes updated information which meets the requirements of

 

RD Instruction 1940.105(b)).

 

 

American Recovery and Reinvestment Act Davis-Bacon Compliance Checklist

After awarding a construction contract and before construction starts

 

.

_______

 

(date)

 

Pre-Construction Conference:

 

The CO and other project participants will have a

Pre-Construction Conference to discuss the following items. (See

 

requirements of RD Instruction 1940.106(d).)

 

 

The CO, inspectors, or applicant may monitor contractor’s adherence to the

Davis-Bacon and Related Acts requirements at any time.

 

 

 

Non-compliance with the Davis-Bacon and Related Acts requirements may

result in termination of the contract and debarment of the contractor.

 

 

 

Enforcement of non-compliance with the Davis-Bacon and Related Acts

requirements may result in penalties

 

 

 

Although the Agency and owner has the right to perform employee

interviews, typically information can be confirmed by reviewing progress

 

reports and contractor’s typical payroll records.

 

 

 

The contractor shall maintain posted on site a copy of the Davis-Bacon and

Related Acts poster (form WH-1321) and a copy of the wage determination.

 

The poster is available at:

 

 

http://www.dol.gov/esa/whd/regs/compliance/posters/davis.htm

 

 

, with a Spanish

version available at

 

 

http://www.dol.gov/esa/whd/regs/compliance/posters/davisspan.htm

 

 

. (The wage

determination should have been provided to the contractor as a part of the

 

bid package and the contract.)

 

 

During Construction (Monitoring)

_______

(date)

Certification of Compliance:

 

Contractor and subcontractors must provide

certification of compliance with the Davis-Bacon and Related Acts to the CO /

 

approved lender, as well as copies of payroll records for the period during which the

 

work was performed. (See RD Instruction 1940-C (1940.106(e)(1))).

 

_______

 

(date)

 

Determination of Non-compliance:

 

The project inspector or CO, on determining

that the contractor is not in compliance, will notify the appropriate parties, including

 

the Agency and approved lender (if applicable) who will then contact the State

 

Director for advice and further instructions. (Additional information on actions to be

 

taken is available in RD Instruction 1940-C (1940.106(e)(2) and (3), and

 

1940.106(f)).)

 

_______

 

(date)

 

Semiannual Report

 

. RD field offices or approved lenders will submit to the State

Director Form RD 440-29, “Semiannual Labor Compliance Report,” for projects

 

requiring compliance with the Davis-Bacon and Related Acts for the periods

 

established in RD Instruction 1940-C (1940.107(a)). (October through March, and

 

April through September)

 

_______

 

(date)

 

Consolidated Report

 

. RD State Offices will consolidate all reports received from

field offices and approved lenders, and forward copies to the Administrator no later

 

than April 30 and October 31. (See RD Instruction 1940-C (1940.107(b)).)

 

American Recovery and Reinvestment Act Davis-Bacon Compliance Checklist

After Construction

_______

(date)

Recordkeeping

 

. The Agency official or approved lender responsible for the project

will preserve all payrolls and certifications for a period of 3 years from the date of

 

final payment on the contract. (See RD Instruction 1940-C (1940.108).)

 

___________________________ __________

 

Contracting Officer date

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s